Waneta Expansion Generating Station
The Waneta Expansion project saw the construction of a 335 MW powerhouse immediately downstream of the existing Waneta Dam.
The Waneta Expansion project saw the construction of a 335 MW powerhouse immediately downstream of the existing Waneta Dam.
The Brilliant Expansion Project saw the addition second powerhouse located immediately downstream of the Brilliant Dam on the Kootenay River.
The Arrow Lakes Generating Station Project saw the addition of a powerhouse located immediately downstream of BC Hydro’s water storage Hugh Keenleyside Dam on the Columbia River.
The Brilliant Dam and Generating Station were purchased in 1996 from Cominco (now Teck).